1. One-time setup / NRE
Process engineering, work instructions, tooling and fixture preparation, where applicable.
2. Assembly unit rates
Rates correspond to the defined measurement unit: piece, joint, screw, connection, pack or product.
3. Materials and purchased parts
BOM material procurement and sourcing costs shown separately when included.
4. Quality and testing
In-process inspections, functional testing, records and any validation plan.
5. Packaging and logistics
Packing material, labels, consolidation and delivery as specified.
6. Volume assumptions
Rates and batch charges depend on order volume, mix and production frequency.